WorkPackage 1: Network Scenarios and Requirements

TASK 1-2: Network requirements

Document produced

Responsable
Deadlines

Starting Document (task 1)

T-NOVA

May 7

Overview of the different technologies to deal with in LION (task 2)

IMEC

May 2: sending contribution

May 8: first draft

WP1M1: Network requirements

TPSA

End of May / beginning of June

TASK 3-4: Network architecture

Document produced

Responsable
Deadlines

Interworking functionality for the testbed (task 3)

UPC

May 8: inputs

May 15: integration and distribution

May 22: comments

May 31: final document

Network functionality definition (task 3)

UPC / AGH

May 26: inputs

June: 9: integration and ditribution

June 13-15: comments

June 30: final document

Classifying, compiling, summarizing and editing the final document (task 4)

UPC / AGH / IMEC and NTUA

May 26: inputs

June: 9: integration and ditribution

June 13-15: comments

June 30: final documen

WP1M2: Network scenarios and guidelines for testbed configuration

UPC

End of June/ beginning of July

Final Document

Document produced

Responsable
Deadlines

Deliverable 6: Network scenarios and requirements

AGH

End of September

Last Modified: April 2000
 