Milestone Template
Documents Template
WorkPackage 0
M1: Project internat review (M6)
M2: Project internat review (M12)
M3: Project internat review (M18)
M4: Project internat review (M24)
M5: Project internat review (M30)
M6: Project internat review (M36)
WorkPackage 1
M1: Network requirements (M3)
M2: Network scenarios and guidelines for testbed configuration (M6)
M3: Preliminary results on optimised network architecture (M18)
WorkPackage 2
M1: First indication on failure scenarios and resilience strategies (M6)
M2: First report on resilience interworking strategies in multilayer networks (M16)
WorkPackage 3
M1: Specification of functionality of the available planning and simulation tools (M9)
M2: Definition of network planning case studies (M18)
WorkPackage 4
WorkPackage 5
M1: Specification of the core management functionality of the umbrella system (M9)
M2: Network level information model for the subsystem interfaces of the umbrella system (M12)
M3: Revised information model (M22)
WorkPackage 6
M1: OA&M specification for integreation of network elements in the testbed (M6)
M2: Definition of OA&M strategies for the testbed (M17)
WorkPackage 7
M1: Implementation of subsystem for IP-routers (M12)
M2: Testing of subsystems and umbrella management system for testbed (M25)
WorkPackage 8
WorkPackage 9
M1: Preliminary testbed subsystems tests performed (M15)
M2: Testbed pre-trials (M27)
M3: Final testbed integration (M30)
M4: Testbed experimental results (M34)